The soladeck sd 0799 5g roof mount combiner box is a nema 3r enclosure made from 18 gauge galvanized 90 steel with a powder coated finish.
Soladeck metal roof.
Their combiner and enclosures reduce the cost and time of installing a roof mount photovoltaic array.
Remove the knockouts needed to penetrate the roof roof deck.
Cut the roofing material to the shape of the template use a pry bar to loosen the shingles then remove any nails that would interfere with the soladeck flashing.
However you do have the option of leaving the shingles in place and installing the roofing over them if the roof is in good shape.
The removal itself could cost anywhere from 3 to 5 per square foot.
The enclosures are designed for composition shingle or cedar shingle roofs.
Soladeck is a pv wire enclosure and seamless flashed product all in one.
It eliminates the multiple parts and respective labor typically needed to accomplish the roof penetration for a weather tight wiring passageway into the home.
Soladeck is one of a kind in the solar industry designed with a seamless flashing consistent with standard roofing practices.
Are you installing a solar array and have questions about the best wiring enclosures.
For all your standing seam metal roof needs repairs install or soladeck box install give us a call at 210 900 0977 or fill out the form.
Soladeck incorporates a unique flashing that is a seamless part of the enclosure and prevents incorrect penetrations in the roof system.
Quick easy and consistent install every time protect panel wiring with a weather proof flashed seal.
In stock at store today.
Top sellers most popular price low to high price high to low top rated products.
Soladeck flashed photovoltaic roof mount system.
Soladeck manufactures roof mounted combiner boxes and electrical enclosures that allow for pre wiring of solar panels most frequently for roof mounted solar arrays prior to installation.
Slide the soladeck into place beneath the shingles and mark the knockout locations.
Replacing shingles with metal roofing is not necessarily difficult but it will require labor and time.
3 wide rib panel.